{"id":467,"date":"2019-05-17T12:20:31","date_gmt":"2019-05-17T12:20:31","guid":{"rendered":"https:\/\/phoster.fi\/?page_id=362"},"modified":"2019-10-18T13:09:54","modified_gmt":"2019-10-18T10:09:54","slug":"data-system-projects-2-2-2-2-2","status":"publish","type":"page","link":"https:\/\/phoster.fi\/?page_id=467&lang=en","title":{"rendered":"3. Information System projects"},"content":{"rendered":"\n<p>We have implemented systems development projects in large and small organics in a number of different areas. It is essential to see system development as part of the business development. That&#8217;s why we&#8217;ve always switched system development to business strategy. The strategy is linked to the identification of essential system requirements and the direction in which the business is developing.<\/p>\n\n\n\n<p>The project must have a clear Business need and objective:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Business Support<ul><li>New Product or service<\/li><li>Extending service<\/li><\/ul><\/li><li>Automation<ul><li>Manual process automation<\/li><li>IoT and connecting to back systems<\/li><\/ul><\/li><li>Cost savings<ul><li>Less manual work<\/li><li>Delete non-value-added steps<\/li><\/ul><\/li><li>Development of reporting<\/li><li>Update a system solution<ul><li>old system not supported<\/li><li>Too many fragmented systems<\/li><li>The security of systems should be developed<\/li><li>Poor system performance (slow, downtime, absorption)<\/li><\/ul><\/li><li>&#8230;<\/li><\/ul>\n\n\n\n<p>Not all the above objectives need to be present, but some should be identified,   documented and communicated to the whole organisation and project team.<\/p>\n\n\n\n<p>The links below will take you to a closer look at the perspectives and methods of IT development in different areas:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><a href=\"https:\/\/phoster.fi\/?page_id=299\">IT strategy<\/a><\/li><li><a href=\"https:\/\/phoster.fi\/?page_id=356\">IT Governance<\/a><\/li><li><a href=\"https:\/\/phoster.fi\/?page_id=297\">IT System projects<\/a><\/li><li><a href=\"https:\/\/phoster.fi\/?page_id=304\">Integration projects<\/a><\/li><\/ul>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"676\" src=\"https:\/\/phoster.fi\/wp-content\/uploads\/2019\/09\/System_landscape_2-1-1024x676.jpg\" alt=\"\" class=\"wp-image-479\" srcset=\"https:\/\/phoster.fi\/wp-content\/uploads\/2019\/09\/System_landscape_2-1-1024x676.jpg 1024w, https:\/\/phoster.fi\/wp-content\/uploads\/2019\/09\/System_landscape_2-1-300x198.jpg 300w, https:\/\/phoster.fi\/wp-content\/uploads\/2019\/09\/System_landscape_2-1-768x507.jpg 768w, https:\/\/phoster.fi\/wp-content\/uploads\/2019\/09\/System_landscape_2-1.jpg 1403w\" sizes=\"auto, (max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>We have implemented systems development projects in large and small organics in a number of different areas. It is essential to see system development as part of the business development. That&#8217;s why we&#8217;ve always switched system development to business strategy. The strategy is linked to the identification of essential system requirements and the direction in &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/phoster.fi\/?page_id=467&#038;lang=en\" class=\"more-link\">Jatka lukemista<span class=\"screen-reader-text\"> &#8221;3. Information System projects&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-467","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/phoster.fi\/index.php?rest_route=\/wp\/v2\/pages\/467","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/phoster.fi\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/phoster.fi\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/phoster.fi\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/phoster.fi\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=467"}],"version-history":[{"count":3,"href":"https:\/\/phoster.fi\/index.php?rest_route=\/wp\/v2\/pages\/467\/revisions"}],"predecessor-version":[{"id":506,"href":"https:\/\/phoster.fi\/index.php?rest_route=\/wp\/v2\/pages\/467\/revisions\/506"}],"wp:attachment":[{"href":"https:\/\/phoster.fi\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=467"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}